432888com威尼斯人,2020最新官网

  English  >  Press  >  latest news  
 
Huaneng Making Obvious Achievements in Energy Saving & Emission Reduction
     

  In 2007, Huaneng pushed forward energy saving and emission reduction by strengthening the 

  implementation of the “Three Responsibility Statements”, “one-vote-down system” and “3 simultaneous”; 

  modified and improved the plan for creating a saving and environmentally-sound enterprise, clarified the 

  standard for energy saving and emission reduction, continued to carry out the move for creating a saving 

  and environmentally-friendly enterprise; improved the examination system with the “one-vote-down 

  system” as a primary content and further improved the mechanism of energy saving and emission reduction 

  by establishing a three-level management system; actively carried out compliance management, intensified 

  technical transformation, increased the investment in key projects and tapped the potentials for energy 

  saving and emission reduction; increased pressure on itself and took the initiative to reinforce energy 

  saving, environmental protection and closedown of small thermal generator sets.

   

  In 2007, the Company satisfactorily attained the annual objectives set out in the Three Responsibility 

  Statements for energy saving, emission reduction and closedown of small thermal generator sets. The 18 

  power plants included into the “1000 businesses to save energy” initiative saved about 1 million tons of 

  standard coal, accounting for 242% of the annual target. The coal consumption for power supply last year 

  reached 337.37g/KWH, achieving a year-on-year decrease of 7.74g/KWH.The capacity of the generator 

  sets equipped with desulphurization facilities reached 37.305 million KW, accounting for 57% of the 

  installed capacity of coal-fired generator sets. 13 power plants, including Yuhuan Power Plant, were named 

  exemplary saving and environment-friendly coal-fired power plants or saving and environmentally-friendly 

  coal-fired power plants, with the indexes of energy saving and environmental protection reaching advanced 

  level in China, some even reaching advanced international level. 2,391,250 KW of small generator sets 

  were already closed down, accounting for 95.2% of the capacity set out in the responsibility statement 

  signed with the state for closing down small thermal generator sets in the 11th Five-Year Plan period.

   

 
 
 
Copyright ? 1997-2013 by China HuaNeng Group all rights reserved
XML 地图 | Sitemap 地图